Stormwater Inspections
A Stormwater Connection Permit is required before connecting or making changes to Council’s drainage system. Stormwater inspections are required to ensure that this work is performed to the Council’s standards.
Booking a stormwater inspection
You can book a stormwater inspection by:
For all inspections, there are a few points to keep in mind:
- You must have a valid Stormwater Connection Permit approved before you can book the inspection (refer to permit number and expiry).
- You’ll have to book the inspection at least a full 24 hours before the inspection is required.
- A representative of the owner or contractor must be on site at the arranged inspection time. Additional inspections may need to be booked if no one attends at the inspection time.
- Inspections are not conducted on afternoons, weekends or public holidays.
Additional stormwater inspections
The stormwater connection permit includes some stormwater inspections.
- If the stormwater connection is to the kerb and channel without an on-site detention (OSD) system, the permit includes one drainage inspection.
- For all other types of stormwater connections (including those with on-site detention systems), the permit includes 2 drainage inspections.
When the drainage connection work is not to our standard or is incomplete, extra drainage inspections may need to be undertaken. An additional fee of $146.90 will be charged for each additional inspection.
Stormwater inspection written report
A written report of a stormwater inspection can be obtained for an additional cost of $35.30 per report. Please email mail@monash.vic.gov.au to request a report.